At the former Costaguta shipyards, a tent city was initially set up. Containers were installed in December 2023. Temporary closure between December and January, with reopening in early January (for refitting).
Thirteen modules (designed to accommodate a maximum of 52 guests in groups of four) and five service units including showers and toilets are operational, plus two additional modules for on-duty and warehouse use.
At least 75 admissions have been reached simultaneously.
Sources
Press:
- Migranti, a Voltri spunta il campo accoglienza: tende montate negli ex cantieri navali
- Migranti, la vita nel campo di Voltri: la solidarietà, le cure, l’impegno della Croce Bianca Genovese e dei volontari
- Genova, 29 migranti in arrivo da Catania sistemati nell’hub di Voltri. La struttura ha 20 nuovi moduli abitativi